SayProApp Courses Partner Invest Corporate Charity Divisions

SayPro Email: SayProBiz@gmail.com Call/WhatsApp: + 27 84 313 7407

SayPro Infrastructure Documentation Log

Task: Upload of Architectural Drafts and Budget Estimates
Platform: SayPro Building Tracker
Managed by: SayPro Community Education Centres Strategic Partnerships Office
Date of Upload: 3 March 2025
Reference Code: SCSPR-20 / DraftSet-March


βœ… Centres Uploaded:

1. Flagstaff Community Education Centre (Eastern Cape)

  • Architectural Drafts:
    • Multi-purpose hall layout
    • 3-classroom block
    • Solar-powered ICT lab
  • Budget Estimate:
    • Total: R 3.6 million
    • Includes site prep, eco-friendly materials, and community labour integration
  • Supporting Files Uploaded:
    • Floorplans PDF
    • Budget Breakdown Excel
    • 3D exterior rendering

2. Ga-Rankuwa Community Education Centre (Gauteng)

  • Architectural Drafts:
    • STEM innovation studio
    • Open-access digital library
    • Admin and counselling office
  • Budget Estimate:
    • Total: R 5.2 million
    • Includes high-spec technology fit-out and fibre connectivity infrastructure
  • Supporting Files Uploaded:
    • CAD Files (compressed folder)
    • Financial Proposal PDF
    • Risk Mitigation Budget Note

3. uMzimkhulu Community Education Centre (KwaZulu-Natal)

  • Architectural Drafts:
    • 2-classroom modular unit
    • Covered outdoor community amphitheatre
    • Sanitation block with rainwater harvesting
  • Budget Estimate:
    • Total: R 2.8 million
    • Designed for phased development based on local capacity
  • Supporting Files Uploaded:
    • Modular Unit Blueprints
    • Cost Forecast Spreadsheet
    • Community Labour Contribution Outline

πŸ“ All files have been logged under:

SayPro Building Tracker β†’ 2025 Projects β†’ Drafts & Budgets β†’ March Uploads

πŸ“Next Actions:

  • Assign compliance reviewers to validate budget estimates.
  • Schedule architecture review meeting with SayPro Technical Advisors.
  • Share draft plans with local stakeholder committees for input before final approval.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *